emmies1109 emmies1109
  • 01-10-2020
  • Mathematics
contestada

Kiesha can install a fence in 3 days. Robert can install the same fence in 8 days. How long, in days,
would it take Kiesha and Robert to install the fence if they worked together?

Respuesta :

EH3633 EH3633
  • 01-10-2020

Answer:

5.5 days

Step-by-step explanation:

you need to find the average between them so add them up and divide by 2.

Answer Link

Otras preguntas

What is the answer ?
Ayúdeme es para mañana
describe how you can use a compass needle to determine the direction of a magnetic field at a given location
All of them plz btw look at my other answer to see to data
You must design a valid experiment to show that there are microorganisms in the air.  What would be your dependent variable? sterilized broth growth of organism
Please select the correct sentence from the options below. because they could not endorse either candidate, large numbers of people did not vote in the election
Explain the influence of the space race on the Cold War 3 sentences
can anybody help me with unit rate
A video is different from text because it is static. active. detailed. informative.
I NEED HELP FAST FIRST ONE TO ANSWER I WILL MAKE BRAINLIEST 1. Consider these tables for Line 1 and Line 2. Line 1 x y 0 1 3 4 Line 2 x y 0 0 2 4 (a) Graph Lin