Why is the monitoring and controlling phase extremely important to the success of the project

Respuesta :

zdgzr
zdgzr zdgzr
  • 22-01-2020

Answer: It is the only way to ensure that work plan estimates are on track and that early intervention can take place.

Explanation: APEX

Answer Link

Otras preguntas

Carter bought a storage bin that measured 24 inches long, 18 inches wide, and 12 inches high. What is the volume of Carter’s storage bin, in cubic inches? Volum
What are the features of urban populations in developing and developed countries?
A race car driver completed 60 laps in 1 hour and 30 mins at a speed of 180 km/h. How many Km has she raced in total. SHOW YOUR WORK!
Trevor and marissa have 46 t-shirts to sell if marissa has 6 fewer than trevor how many t-shrits does trevor have
Pls help me guys! This is super hard
What is the axis of symmetry of this equation? y=x^2-2x-8 x = - 2 x = - 4 x = 1 x = - 8
Rachel wants to collect data about the snack habits of her friends. Which questions are statistical questions she could ask? Select each correct answer. Does M
What has the most negative effect on community's infrastructures?
Find the exact values
what is the derivative of root 2x ?