liluv4590 liluv4590
  • 02-04-2019
  • Mathematics
contestada

A potter works 4 days a week, makes 14 pots per day on average, and charges $24 a pot. Money per 4-day workweek?

Respuesta :

greubel80
greubel80 greubel80
  • 02-04-2019
Step by Step:

14 average pots x 4 days a week = average money made

14x4= 56

56 pots a 4-day week x 24$ a pot

56x24 = 1344$
Answer Link

Otras preguntas

Evaluate 10x2y−2 for x = –1 and y = –2.
Little Crazy's pizza is expensive, not to mention terrible. It's greasy, the crust is stale, and it costs a whopping $4 a slice! Big Berto's slices are also ove
The step in which mrna is decoded into an amino acid sequence at the cell's ribosome? during the process of protein synthesis, what is the step in which mrna is
In which species of animal does sebum eventually become lanolin? A. Caprine B. Feline C. Ovine D. Bovine
You have $6000 with which to build a rectangular enclosure with fencing. The fencing material costs $30 per meter. You also want to have two partitions across t
Determine the appropriate amount and classification for each of these items
A small bakery sells a variety of different breads and buns. The bread is sold by the loaf, and each loaf is sold for the same price. The buns are sold by the
which sentence in the story helps you predict that Mma ramotswe will be successful
Recent research investigating adolescent health around the world has found that there is an increase in
Which is true 159.399>159.410, 11.0=11.000, 5.9 <5.899n 1,4036>1.7001