Ibbythe8356 Ibbythe8356
  • 04-05-2019
  • Social Studies
contestada

When planning your week the first thing to consider about each activity that your scheduling is its priority level?

Respuesta :

RyleeCanaan12 RyleeCanaan12
  • 04-05-2019

Answer:

yes

Explanation:

i think that if you are going to get things done, than you need to think about how important they are. if something is needed in two weeks, you can save that for later. if something is needed in two or three days, i would do that first. different people have different ways of planning, but that is my opinion

Answer Link

Otras preguntas

The decline in medieval trade was caused by
What is 9x^2-24x+ 16
The decline in medieval trade was caused by
which is more acidic pH2, pH4 or pH6?
What's an equivalent fraction for 10 15 by dividing
SAT Help Jack can paint a house in 5 days, and Richard can paint the same house in 7 days. Working together, how long will it take them to finish the job? How d
Can someone help me in probability?Amanda wrote a computer program that generates two random numbers between one and eleven.When she runs it,what is the probabi
There is a turtle race. The race will last 2 minutes. I have to find the distance from the start each turtle will be at the end of the race. Speed (in inches pe
the length of a rectangle is 3 feet less than twice the width of the rectangle. if the perimeter of the rectangle is 324 feet, find the width and the length?
What does imagery mean