Deuce6694 Deuce6694
  • 02-09-2019
  • Social Studies
contestada

Which two actions are part of the Scrum Master's role in PI Planning?

Respuesta :

rejkjavik rejkjavik
  • 12-09-2019

Answer:

1) time spent on analyzing every story is more

2) part timer scrum master are not much have proper time to plan

Explanation:

scrum is a lean system engineering rtechniques

the two action that are the crucial part of scrum master's role in PI planning is

1) time spent on analyzing every story is more than the other part

2)part timer which work as a scrum master do not have proper time slot to plan as important member of team.  

Answer Link

Otras preguntas

Which is greater 0.48 or -0.58?​
Amanda, Jen, Shelby went to dinner and split the bill evenly. Each girl payed $14.25 and t tip. if the total bill including tip was 51.75, find the amount each
What are the main causes of Florida residents' preference for paint powder coating?
How many one PGAL need ATP and NADPH
fav skz member?........​
what percent of 105 is 63
I have no idea how to solve a or b without a calculator
Prepare an extensive Comparison Table of Energy Resources used in India. (Include conventional, non conventional, potential and stock resources)
Hi! Can one of y'all just check my answers for me? I am just a bit unsure before I submit them. 100 Points. Thanks! 1. The set of linear equations provided des
The function f is such that f(x) = 5 + 6x – x2 for x  3 (a) Express 5 + 6x – x2 in the form p – (x – q) 2 where p and q are constants.Using your answer to part