​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

what subject pronoun would you use when talking to your parents
What is culture to you
solve each eqaution justify each epaution 20-3h=2
You measure the lengths of three worms for a biology experiment. The shortest worm is 1.28 inches and the largest worm is 1.285 inches. Which of the following
What are the basic metric or SI units for
which number is a perfect square? 33 37 48 49
what was the original reason for the british to begin enforcing taxes in the colonies
6k squared -kl 4l squared
If you don’t understand a point made by a speaker, it is okay to _____. a. Tell the speaker they are not communicating well b. Request that the speaker start ov
factor out the coefficient of variable for the following expression 4h-3