The Engineer of Record may exercise control over a project by means of electronic communication devices.a. Trueb. False

Respuesta :

onyebuchinnaji
onyebuchinnaji onyebuchinnaji
  • 05-01-2020

Answer:

False

Explanation:

The Engineer of Record for all projects shall be a registered Professional Engineer (P.E.)

Some Detailed Responsibilities of Engineer of Record

The Engineer of record shall attend

  1. Pre-Construction Conferences,
  2. Pressure Tests,
  3. Lift Station Start-ups,
  4. Pre-Final Walk-through and
  5. Final Inspections, etc.

All these responsibilties require his physical presence which cannot be achieved through electronic communication.

Answer Link

Otras preguntas

9.6, –4.8, 2.4, –1.2, 0.6, ... f(n + 1) = –0.5f(n) f(n + 1) = 0.5f(n) f(n + 1) = f(0.5n) f(n + 1) = f(–0.5n)
what is the answer to 87=177-w​
A cylinder has a height of 3 inches and a diameter of 3 inches. What is the volume of the cylinder?
If the shaded of a bar representing 1/3 is divided into 6 equal parts, what is the fraction of one of these parts
HELP ASAP ALGEBRA 2 please!!
Waves with an amplitude of 2ft pass a doc every 30 seconds. Write an equation for a cosine model the height of a water particle above and below the mean water l
A bicyclist covered 5/7 of his route and an additional 40 miles. He has yet to cover 118 miles less than 0.75 of his route. How long is his route in miles?
I need some help with ideas
When energy changes from one form to another, some energy is always changed to A. Electricity. B. Heat. C. Sound. D. Light.
how would bimetallism help the economy, according to its supporters?