if 12 people can finish a job by 5 days how many days will be required finish the same job by 10 people

Respuesta :

ishashunnny
ishashunnny ishashunnny
  • 01-09-2020

Answer:

4

Step-by-step explanation:

12p=5d

1p=5/12

10p=4.1666

≈4 days

Answer Link

Otras preguntas

Find the orthogonal projection of f onto g. use the inner product in c[a, b] f, g = b f(x)g(x) dx a. c[0, 1], f(x) = 3x, g(x) = ex
A line passes through the point (4, –3) and has slope m = 1. Find the equation in point–slope form. y + 3 = x + 4 y + 4 = x - 3 y - 4 = x - 3 y + 3 = x - 4
h(15)=-16.1(15)^2+150
Two 6-sided dice are rolled at the same time. How many outcomes correspond to the event that the sum of the numbers is 5?
The volume of a rectangular prism is 72 cubic centimeters. The prism is 2 centimeters wide and 4 centimeters high. What is the length of the prism?
The overall result of the proton-proton chain is that ________
Solve the following for y: y-2=-6(x-(-2))
Choose the word that fits the definition: a linguistic element added to a word to produce an inflected or derived form, also called "the building blocks of Engl
Which strategy allowed Germany to have immense success at the beginning of World War Two
Gerri's psychologist has suggested that she take time to relax and silently pay attention to her inner state. this technique is called: