IUlawyer8169 IUlawyer8169
  • 01-01-2021
  • Business
contestada

When multiple teams work together on the same product each team should:_____.

Respuesta :

Parrain
Parrain Parrain
  • 03-01-2021

Answer: B. False

Explanation:

A product backlog is the list that records the improvements to be made to a product.

Teams operating separately should not have multiple backlogs but should have one so that when the team mean to develop the product looks at the backlog, there is one single authoritative file instead of multiple ones that could complicate things.

Answer Link

Otras preguntas

If the Campbell Candy company can produce Sarah's special candy bars at 100 for $165 and 600 for $195 write the cost function for the production process?
Is two thirds the same as four sixths
Where is the midpoint of (6,11) and (10,16) Use the rules of negative numbers to calculate -5+-7--3
If 150g of sugar is used for 5 cakes How much is used for 7 cakes?:)
what is 4x squared minus 3x to the 5th plus x
Although dry regions may never be as densely populated as those near water, which of the following factors has led to increased populations in dry areas?
What is 10/25 simplified
What was Vladimir, Grand Prince of Kiev, known for? A. After sending out men to investigate various religions, he chose Eastern Orthodox Christianity as the sta
18/48 as it's simplest form?
You want to buy the bicycle that is $116. You already have $43.50 saved and plan to save an additional $7.25 every week. Part A: Write and solve an equation to