medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

which is correct answer? ​
What the answer?? :)
What is the solution to the following system of equations?
choose a topic based on what you read in act 2 or act 3 of romeo and juliet. then write a thesis statement.
Evaluate the expression 2x - 5 when x = 3. A) -4 B) 1 C) 6 D) 11
How did the American dream change throughout the 20th century?
Find the angle x in this triangle
Indicate the equation of the given line in standard form. The line with slope and containing the midpoint of the segment whose endpoints are (2, -3) and (-6,
What are some key developments on the election of 1800 ?
Cost to store: ? Markup: 80% Selling Price: $100.80. What is the cost to store?