shresthasamrachana06
shresthasamrachana06 shresthasamrachana06
  • 01-04-2021
  • Mathematics
contestada

12 workers can do a peice of work in 20 days. How many workers should be added to complete work in 16 days?​

Respuesta :

atchleyamirah69
atchleyamirah69 atchleyamirah69
  • 01-04-2021
3 workers

if 12 workers can do a piece of work in 20 days, then one person can do it in 240 days. 240/16 is 15. That is the number of workers that you need in total to it in 16 days. Since the question ask how many more workers,
15 - 12 = 3 more workers.
Answer Link

Otras preguntas

Describe an occasion when a group of proper are eating together . (Descriptive writing) minimum 250 words
Which charge does iron (Fe) have in iron sulfate (FeSO4)?
3. JH is the geometric mean of which two segments?​
Please Help!!! Very apreciated
A barrel shaped like a cylinder is laid on its side and rolled up a ramp. The barrel has a circular base that is 2.5 ft in diameter. If the barrel turns 26 time
Pls help asap! Due in 5 minutes!!! Pls
1. Which layer do we live on? 2. What layer is directly below your answer above? 3. What is the thickest layer? 4. Which 2 layers are included in the lithospher
John pushes his bed to the right overcoming the force of friction.
Does anyone know what a Ti-Liger is???
in a certain specifies of dog, wire hair (H) is dominant to smooth hair (h). In a large, randomly mating population of dogs, 15% have smooth hair. Assuming this