ramesh can complete a piece of work in 10 days he worked for 4 days and left. if dinesh complete the remaining part of the work ,how much work was done by dinesh​

Respuesta :

rylaneckst rylaneckst
  • 05-05-2021

Answer:

100% of the work was done by him

Answer Link

Otras preguntas

Brenda studies frequently for her class in hopes of earning an A in the class. She is trying to keep her grade point average as high as possible. She is motivat
What is it equal to?
When concentrated [tex]CaCl_{2}(aq)[/tex] is added to [tex]Na_{2}HPO_{4}[/tex], a white precipitate forms that is 38.7% Ca by mass. Write a net ionic equation r
Although the reactions of the calvin cycle are not directly dependent on light, they usually do not occur at night. why?
What electron current is driven through a 2.3-mm-diameter iron wire by a 0.063 v/m electric field?
HELP PLZ ASAP!!!!!!!!!
which victorian social code is reflected in miss prisms words and actions
What do you do about cyberbullying if the first adult you tell doesn't take you seriously?
what top-grossing film of 1921 turned then-little-known actor Rudolph valentino into a superstar and associated him with the image of the Latin lover?
find the length of the base indicated for each trapezoid