ginapogones6676 ginapogones6676
  • 02-07-2021
  • Business
contestada

A costing system that uses actual costs for direct materials and labor and predetermined overhead rates to apply overhead is called a(n)

Respuesta :

topeadeniran2 topeadeniran2
  • 07-07-2021

Answer: normal costing system

Explanation:

A costing system which uses the actual costs for direct materials and the labor and predetermined overhead rates to apply overhead is referred to as the normal costing system.

Normal costing system is the cost allocation method whereby cost is assigned to products which are based on the labor, materials, and the overhead which are used in their production.

Answer Link

Otras preguntas

which is more basic,pyrole and pyridine?​
In Charlie's family, two people have blue eyes, and three people have brown eyes. Write a fraction to represent the part of the family that has blue eyes.
if Indianapolis had the same porportion of Nintendo Switch owners as Tokyo per capita, how many would Indianapolis expect to have? Write you anser in a meaningf
complete gustar phrases​
Calculate the ratio of surface area to volume of an imaginary cubic cell measuring 4mm long on each side
All of the following were issues that led to the Civil War except... the attack on Harper's Ferry the Dred Scott Decision The Missouri Compromise The Monroe Doc
The United States spends more of its total budget on its military than it does on Social programs. True or False
What is Maria’s hypothesis for the experiment? State why Maria think this is a good hypothesis
order from least to greatest? please​
Write a fraction notation for 9.73