mparrish2965 mparrish2965
  • 03-07-2022
  • Engineering
contestada

A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

what is a good question for me to ask that i can put up for 100 points?
Plants store _____ energy in their tissues. A mechanical B heat C light D chemical
NEED AN ANSWER NOW!! ITS WORTH THE POINTS!! DUE TODAY AT 10!!!!! The grid above shows the graph of the parent function and a translated functions graph. Write
Write the equation so that a = 1: x2 + -6 x = -13 Complete the square: x2 – 6x + = –13 +
To apply for a job at the new store in the mole. is this a fragmentation sentence ​
PROJECT: SUMMARIZE IT! The ability to summarize information is a vital component of understanding the information you read in your coursework. To summarize info
What’s the correct answer answer asap for brainlist
Write the equation so that a = 1: x2 + -6 x = -13 Complete the square: x2 – 6x + = –13 +
Subtract the following complex numbers: (11-7)-(16-11) A. 5+ 4i OB. 5-18i O C. -5-18i OD. -5+4i
plum-pudding model other name​