Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

The length of a pool is 3 feet more than twice its width. If the perimeter of the pool is 72 feet, find the dimensions of the pool by writing and solving a syst
you have a full cylindrical glass of water that stands 8 inches tall and has a radius of 1.5 inches .if you pour the water into a larger cylindrical glass that
The formula C = 20x + 5 models the cost of New York Yankees T-shirts, where C is the cost and x is the number of shirts sold. Choose ALL TRUE statements in the
The diameter of your bicycle wheel is 25 inches. How far will you move in one turn of your wheel?
Which of the following rivers is the world's busiest waterway ?
If 2 less than or equal too X less than or equal too 6, which of the following has the greatest value
How many eighths are there in 4 1/4
The process by which rocks are broken down into smaller fragments by the atmosphere and other factors in the environment is called?
conversation between Hitler and gandhi
what time is 9 hours and 30 minutes before. 4:25