pieman33333 pieman33333
  • 04-04-2018
  • Mathematics
contestada

Three workers can do a job in 28 hours. How many more workers are needed to do this job in 12 hours?

Respuesta :

MrRamon
MrRamon MrRamon
  • 13-04-2018
4 additional workers for 7 total workers.
if it takes 3 workers 28 hours to do work there are 84 total hours of work (3*28=84) to find how many workers it will take to get the work done in 12 hours divide 84 by 12. 84/12= 7 total workers. 7-3= 4 additional workers needed.
Answer Link
pranilraichura
pranilraichura pranilraichura
  • 08-03-2020

Answer:

4 workers

Step-by-step explanation:

Answer Link

Otras preguntas

Factor by grouping. a2 + 2ab – 24b2 (a + 6b)(a + 4b) (a – 6)(a + 4b) (a + 6b)(a – 4b) (a – 6b)(a – 4b)
Erin is writing about history of sonnets. Which is a fact Erin can include in her history?
Which numbers are imaginary numbers ?
What are the coordinates of the image of vertex F after a reflection across the line y=-X? (-1,-3) (3,-1) (1,3) (-3,1) G(-2. -3) F(1.-3) E -1, -5 H(2-5)
Which function in vertex form is equivalent to fx = 4+x2-2x
Find the value of x if A, B, and C are collinear points and B is between A and C. AB=x,BC=x+2,AC=14 A. 6 B. 10 C. 9 D. 5
Write a function for (0,4)(1,8)
All rhombuses are. Parallelograms square rectangules quadrilaterals
What are some of the different ways in which governments are formed
A cat leaps to catch a bird. If the cat's jump was at 60.0° off the ground and its initial velocity was point of its trajectory? 0.30 m 3.44 m/s, what is the hi